Skip to content

Testing Infrastructure and Coverage Improvements

Overview

This issue tracks testing and coverage improvements identified during MR #3 (closed) review. These items will be addressed in a new PR to avoid blocking the current feature delivery.

🔴 P0 - Must Fix Before Merge (Blocking)

These critical items will be addressed immediately in a new PR:

  • Add comprehensive tests for src/index.ts entry point

    • Test MCP server initialization
    • Test tool registration
    • Test error handling during startup
    • Test stdio communication
  • Fix test infrastructure stability and coverage collection errors

    • Resolve coverage collection issues causing inconsistent reports
    • Fix flaky tests in CI environment
    • Ensure coverage reports are accurate and stable
  • Increase core module coverage to 50% minimum

    • Current coverage: ~30% for core modules
    • Target: 50% minimum for src/index.ts, src/server.ts, src/core.ts
    • Add unit tests for uncovered critical paths

🟡 P1 - Fix in Next PR (High Priority)

To be addressed after P0 items:

  • Optimize regex pattern compilation for performance

    • Cache compiled regex patterns
    • Benchmark current performance
    • Implement lazy compilation where appropriate
  • Add tests for large migration files

    • Test files >10MB
    • Test files with 1000+ SQL statements
    • Ensure memory efficiency
  • Reduce mock usage in favor of integration tests

    • Replace mocked database tests with testcontainers
    • Use real file system operations where possible
    • Maintain test speed while improving reliability

🟢 P2 - Technical Debt (Future Enhancement)

Long-term improvements:

  • Add progress indicators for long operations

    • Implement progress callbacks for multi-file validation
    • Add ETA estimation for long-running tests
  • Implement performance benchmarks

    • Create benchmark suite for critical operations
    • Track performance regressions in CI
  • Add memory leak detection tests

    • Implement heap snapshot analysis
    • Test for connection leaks
    • Monitor memory usage during extended operations

Related Links

Acceptance Criteria

  • All P0 items completed and tested
  • Coverage reports show ≥50% for core modules
  • CI pipeline passing with stable test results
  • No regression in existing functionality

Timeline

  • P0 Items: Immediate - New PR within 24 hours
  • P1 Items: Next sprint
  • P2 Items: Backlog for future consideration